http://shopper.mro-zone.com
 

Search Business

Search:
Category:

Location:

Add your Listing

Browse by Category

OMCS International

  • Digg
  • Delicious
  • Technorati
  • Reddit
  • Stumbleupon
  • Furl
  • Fark
  • Slashdot
  • Newsvine
OMCS International
 

1 Slough Road

Altona, Victoria 3018

PMOptimisation is a revolutionary method for improving the effectiveness of maintenance programs and strategies.

PMOptimisation starts with the existing maintenance program used within the plant.

t: view phone+61 3 9315 0330

f: view fax+61 3 9315 0332


OMCS International offers the following products and/or services:
» Uptime (44)
» Training (34)
» Services (20)
» SAP Solutions (6)
» Reliability Centered Maintenance (7)
» PM Optimization (1)
» Oracle Solutions (3)
» Maintenance Management (11)
» Asset Management (18)

Working in cross-functional teams from the shop floor, the PMO team identifies what duplication exists within their own environment and what elements of the current maintenance program are useful and what are inappropriate.

The team then establishes what critical failures outside of the maintenance program can be handled by PM. Once this is completed, the team establishes the most efficient and effective method for managing the maintenance of the asset given local production and logistics factors.

Safety, environmental and legislative considerations are always paramount. The principles of RCM are applied to the analysis.

The most important aspect of PMOptimisation then commences with implementation. This is driven from many levels in the organisation.
Benefits

The prime benefits of implementing PMO2000™ are:
• Maximised asset reliability, hence minimised down time and hence, increased production capability. Typically, maintenance related down time is halved within six to eight months of commencing.

• Maximised maintenance staff effectiveness. In previous projects, maintenance personnel have become at least 20% more effective and even more productive as the site becomes more proactive in its efforts.

• Maximised effectiveness and return from investment in a CMMS.

• Minimised maintenance expenditure. Maintenance costs are minimised but not at the expense of production up-time (where commercially justified).

• Motivated personnel who have the knowledge, process and tools to continually improve equipment reliability. All personnel are trained in the use of RCM task selection criteria per the SAE standard.

• A business wide and consistent structured approach to maintenance task analysis and selection.

• A documented and defensible (to an SAE standard decision logic) means of justification for each maintenance task or variation from vendor / OEM recommendations.

• Improved safety and environmental performance.

Locations

Australia
North America
South America
Asia
Europe
Middle East

Reviews

Complete the form below to contact us.

Your Email
Subject
Additional message
  Please enter the text you see in the image at the left into the textbox below. This is required to prevent automated submission of contact requests.
Verification Code image cannot be displayed